What are the key points in the installation process of stained glass windows in the Guangzhou Craft Glass Church?


Release time:

Feb 12,2025

The key points of the embedded glass installation process mainly include the following aspects:

8bc4ad2d96a8aa6aebf5d489cf51abae

1. Preliminary preparation

Measurement and positioning:

Use tools such as theodolites to accurately measure and set the vertical and horizontal axes of the installation position.

Ensure that the centerline of the main keel matches the axis of the installation position, and check if the curtain wall dimensions are consistent.

Material preparation:

Prepare the required embedded glass, main keel, secondary keel, connectors, decorative strips, bolts, rubber strips, and other materials.

Ensure that all materials meet quality standards and comply with design requirements.

Safety preparation:

Install high-altitude operation equipment such as electric hanging baskets and conduct safety tests.

Operators must wear safety gear, such as safety belts and helmets.

78c8613c-80b5-40fc-a56f-8c3598a140cd

2. Installation process

Keel installation:

Install the main keel and secondary keel according to design requirements, ensuring they are secure.

Use bolts and other connectors to secure the keel, ensuring a firm connection.

Glass installation:

Use suction cup equipment to lift the embedded glass smoothly and slowly move it to the installation position.

Place the glass into the keel slot, ensuring a tight fit between the glass and the slot.

Use rubber strips and other sealing materials to fill the gaps between the glass and the keel, ensuring sealing.

Fixing and adjustment:

Use bolts or pressure strips to secure the glass to the keel, ensuring the glass remains stable.

Check if the glass installation is level; if there are deviations, adjustments should be made promptly.

94d7c434-a9c6-4d86-8a94-d6f92a8f8a3f

3. Post-processing

Sealing treatment:

Apply sealant at the joints between the glass and the frame to ensure the sealing and waterproofing of the curtain wall.

The sealant should be applied continuously without splicing to ensure sealing effectiveness.

Cleaning and maintenance:

After installation, clean the glass surface to remove stains and dust.

Regularly maintain the glass to keep its cleanliness and transparency.

Safety inspection:

After installation, conduct a comprehensive safety inspection to ensure all connectors and fasteners are secure and reliable.

Regularly check the integrity of the glass curtain wall; if there is any damage or looseness, it should be repaired promptly.

88c47aa4f0b0f005bd83985d7ab23b50

4. Precautions

Safe operation:

Throughout the installation process, operators must strictly adhere to safety operating procedures to ensure personal safety.

During high-altitude operations, necessary protective measures must be taken to prevent falls and accidents caused by falling objects.

Quality control:

Strictly control material quality to ensure all materials meet design requirements.

During the installation process, strengthen quality monitoring and inspection to ensure each step complies with standards.

Environmental protection:

During the installation process, pay attention to protecting the surrounding environment, avoiding noise, dust, and other pollution.

Waste should be properly disposed of in accordance with environmental protection requirements.

Latest rear view image

In summary, the key points of the embedded glass installation process include preliminary preparation, installation process, post-processing, and precautions. Only by strictly following these key points can the installation quality and safety of the embedded glass be ensured.