What are the steps involved in the process of custom processing jade glass at the source factory in Dongguan?


Release time:

Jan 02,2025

We are a jade glass factory in Guangdong, capable of providing you with the latest jade glass prices, as well as the latest jade glass processing technology and experienced installation methods. Customer feedback on the jade glass effect has been very positive.

Jade glass is a glass product highly favored by designers both domestically and internationally, widely used in hotel and shopping mall brand store facades, showcasing a noble and luxurious style. But do you know how the construction process of jade glass is completed? Let's follow the steps of Guangdong Haibo Special Glass to find out.

 

02

Preparation phase: First, ensure that the walls or other surfaces in the construction area are clean, dry, and flat. Then, clean the surface of the jade glass and cover it with a protective film to prevent damage during the construction process.

Choosing the installation method: Depending on the specific construction environment and requirements, different installation methods can be selected. A common method is to use stone glue, dry-hanging glue, or glass structural glue to attach the jade glass to the wall, similar to tiling with ceramic tiles or marble.

013

Another method is to use the dry-hanging method of stone materials, fixing the foot code or plug with stone dry-hanging glue to the back of the jade glass. It is important to note that jade glass is not suitable for having grooves or embedded hangers at the edges.

021

Tiling construction: When installing translucent stones, the tiling order must be determined first. In each single-sided luminous wall, the vertical direction should be tiled from bottom to top, while the horizontal direction should start from one end and proceed to the other end. When using a stainless steel frame, lines should be pulled to mark the joint positions of each stone (including horizontal and vertical joints), and the previously installed explosion-proof film on the back should be cleaned.

026

Fixing and bonding: When fixing any translucent stone, the surrounding stones must be pre-assembled to ensure the dimensions are correct and the gaps are aligned with the previously pulled lines. Then, inject the invisible glue between the translucent stone and the bonding glass using a needle, and illuminate it with an invisible light until the glue becomes transparent.

020

Cleaning and maintenance: During the installation of the stones, any invisible glue that overflows from the gaps between the translucent stones should be cleaned promptly. After the entire luminous wall's translucent stones are installed, the jade parts should be wiped with a cloth and a professional stone cleaning and maintenance agent; the mirror stainless steel should be gently wiped in one direction with a non-abrasive detergent using a cleaning cloth.

011

Peeling off the film and acceptance: After completing the cleaning work, tear off the protective film that sealed the translucent stone. At this point, a uniform and transparent jade light box effect should be presented. Finally, conduct an acceptance check to ensure the construction quality meets the requirements.

 

It is important to note that during the construction process, special attention should be paid to maintaining a uniform and slow cutting speed, and sufficient cooling water should be used to wash and cool during processing to prevent jade glass from being damaged due to overheating. Additionally, when dry-hanging on the wall, it is recommended that the size of a single piece does not exceed 0.8 square meters, and the longest side should not exceed 1.2 meters.

Alright~ That's all for today's sharing. If you need to know about the cost of Guangdong Haibo jade glass, you can consult Cao Haibo from Haibo Special Glass for quicker assistance.Guangdong Haibo Jade GlassConcerns about costs.