Photoelectric glass curtain wall installation should pay attention to what


Release time:

Nov 15,2024

The installation of photoelectric glass curtain wall is a complex and delicate project, which requires special attention to the following aspects:

2463cc1dfc26cb9b98fc31341135875f

Preparation before 1. installation

Detailed design and planning:

Determine the type, material, size and thickness of the curtain wall, and consider the structure and use environment of the building to ensure the safety and stability of the photoelectric glass curtain wall.

Develop a reasonable construction plan, including material selection, construction process and safety measures.

Preparation of materials and tools:

Prepare high-quality glass, metal components (such as aluminum alloy profiles), sealants, fixings, cutting tools, etc.

Ensure that all materials and tools are of good quality and meet the design requirements and national technical standards.

Safety inspection:

Safety inspection shall be carried out on the construction site to ensure that there are no dangerous articles in the construction area, and necessary safety warning signs shall be set up.

Workers should wear protective equipment, such as helmets, safety ropes, etc., and receive professional training.

f3d7724b9b2bd3bf95549cdf268797da

Precautions during 2. installation

Main structure installation:

Install the metal structure of the curtain wall according to the design requirements, including the main frame, secondary structure and anchor.

Ensure the firmness and accuracy of the structure, and use theodolite, level and other tools for accurate measurement.

Glass unit installation:

Pre-fabricate the photoelectric glass unit to ensure that its size is consistent with the design drawing.

Install the glass unit into the structure using a suitable fixing method, such as bolting or fixing the back of the structure.

Pay attention to the uniform gap between the glass and the metal member, and use a high-performance sealant for sealing treatment.

Auxiliary equipment installation:

Install doors and windows, ventilation equipment, shading equipment and other auxiliary equipment as required.

Ensure that the installation of these devices meets the design requirements and check whether they function properly.

Quality Control:

Quality control of materials and processes to ensure the quality and reliability of every link.

Special attention should be paid to the detailed treatment of settlement joints, corners, windowsills, parapet tops and other special parts to prevent leakage.

2282c627a86f6a498eb52e51b3d80f50

Inspection and maintenance of 3. after installation

Full Inspection:

After the installation is completed, a comprehensive inspection is carried out, including the flatness, verticality and levelness of the curtain wall.

Ensure that the air tightness, waterproof performance and lightning protection and grounding performance of the curtain wall meet the design requirements.

Maintenance:

Regularly maintain and maintain the photoelectric glass curtain wall, and check whether the drainage system, sealing layer and connecting parts are in normal operation.

Deal with the problems found in time to ensure the long-term performance of the curtain wall.

Safety measures:

During the installation and maintenance process, always follow the safety regulations for high-altitude operations to ensure the safety of workers.

It is strictly forbidden to hang at high places and check the firmness of the safety rope simultaneously.

To sum up, the installation of photoelectric glass curtain wall needs to pay attention to many aspects, including preparation before installation, precautions during installation, and inspection and maintenance after installation. Only by ensuring the quality and reliability of these links can we bring both aesthetic and functional improvements to the building.